Steel Factory – 8.61MWh Project
Achievements: Saving $172,661 annually by utilizing surplus PV electricity stored during the day to reduce peak demand during nighttime. It also participates in grid’s frequency adjustments. The solution promotes de-carbonisation, enhances power supply stability, and reduces dependence on the grid.
Get Free Quote
Experimental Parameters
Follow-ups:
Continuous system monitoring and data tracking ensure optimal performance, supported by preventive maintenance, long-life LFP batteries, and multi-layer fire protection to enhance safety, reliability, and battery lifespan.
Experimental Result
261 kWh × 33 units in parallel
PV+BESS